About The Project

The clients at this property already had their own plans and designs drawn up. After meeting with them, we suggested changing the layout slightly, to maximise the space the loft had, so they would have a larger bedroom.
Our team completed this project in 4 weeks, which included the installation of a new boiler and megaflow system. The exterior of the dormer was finished in the ever popular iron grey cladding, which is very in keeping with the surrounding properties.

The clients are looking forward to moving into their new bedroom, which also includes a small practical en suite.

Pictures

Show more
IMG 4761 min
IMG 4761 min
Read More
Show more
IMG 4771 min
IMG 4771 min
Read More
Show more
IMG 4775 min
IMG 4775 min
Read More
Show more
IMG 4780 min
IMG 4780 min
Read More
Show more
IMG 4782 min
IMG 4782 min
Read More
Show more
IMG 4786 min
IMG 4786 min
Read More
Show more
IMG 4792 min
IMG 4792 min
Read More
Show more
IMG 4793 min
IMG 4793 min
Read More
Show more
IMG 4804 min
IMG 4804 min
Read More
Show more
IMG 4806 min
IMG 4806 min
Read More
Show more
IMG 4813 min
IMG 4813 min
Read More
Show more
IMG 4814 min
IMG 4814 min
Read More
Show more
IMG 4823 min
IMG 4823 min
Read More